Skybuild
  • Home
  • Services
  • About
  • Contact

Builder Assistance and Aircraft Finishing

If you find yourself hesitating to embark on the rewarding journey of constructing a composite aircraft due to either a lack of expertise or space, allow us to alleviate those concerns. Partner with us at Skybuild and tap into our expertise, ample workshop space, and comprehensive array of tools. Whether you prefer following a predetermined plan or working at your own pace, our flexible approach empowers you to be as hands-on as you desire in the construction process, ensuring that your experience aligns perfectly with your aspirations.

Comp Air 6.2 Builder Assistance Programs

All of our builder assistance programs require starting with the "Fast Build" kit option.

Assist Level 1

FUSELAGE
  • Bond in all windows
  • Cut out and laminate floor flanges
WINGS
  • Laminate in all remaining ribs
  • Laminate all flap and aileron ribs
  • Install receiver brackets for flaps and ailerons to include nutplates
  • Install aileron and flap horns with nut plates
HORIZONTAL STABILIZER
  • Laminate in all remaining ribs
  • Install stabilizer horns with nutplates
  • Laminate all elevator ribs
ELEVATOR
  • Laminate in all remaining ribs
  • Install elevator brackets
  • Laminate all elevator ribs
RUDDER
  • Laminate in all remaining ribs
  • Install rudder brackets ​

Assist Level 2

FUSELAGE
  • Install controls to include brackets and nutplates
  • Install aileron pulley channel
  • Install rudder cable system with pedals and brakes
  • Install elevator yoke and pulley system
WINGS
  • Install aileron push/pull tubes with horns for complete aileron motion
  • Install flap push/pull system including motor, all tubes and brackets for complete flap motion
HORIZONTAL STABILIZER/ELEVATOR
  • Pre-install elevator bracket
  • Pre-install elevator main control horn
  • Pre-close horizontal stabilizer
  • Pre-close elevator stabilizer
  • Pre-close elevator and elevator trim
RUDDER
  • Pre-close rudder with rudder trim

​Assist Level 3

FUSELAGE
  • Install gear, wheels, tires, and brakes
  • Install horizontal stabilizer and elevator complete
  • Install rudder - full motion complete
WINGS
  • Close wings, inculdes drains, verts, fuel tank leak test
  • Install wing leading edge (optional)
  • Close flaps, connection - full motion complete
  • Close ailerons - full motion complete
  • Close wing tips (optional)
HORIZONTAL STABILIZER/ELEVATOR
  • Close stabilizer and elevators, connect together - full motion complete
  • Install stabilizer on fuselage (optional) 
  • Install horizontal stabilizer with elevators on to fuselage (optional) ​

Site powered by Weebly. Managed by pair Domains
  • Home
  • Services
  • About
  • Contact